Status of Sewage Treatment Plants (STPs) in Uttar Pradesh
August-2023

S.No STPs in UP Number Capacity (MLD) Utilization capacity (MLD) Utilization % Number of Compliant STP Number of Non compliant STP 
1 Total Installed STP (2+3) 120 3872.08 2890.41 74.6 85 36
A Operational STP 112 3806.08 2890.41 75.9 85 29
B STP Not In Operation 8 66 - - - -
2 Under Trial 7 139 - - 8 0
3 STP in Under Construction 47 927.9 - - - -
Grand Total A : 174 4938.98 - - - -
6 STP in Under Tendering 34
Note-:
The standards as per MOEF&CC Notification dated 13.10.2017, titled "Applicable Effluent Discharge Standards for STPs" are as follows:
For State Capital: pH-6.5-9.0; BOD - <20 mg/l; TSS- <50 mg/l & FC- <1000 MPN/100 ml
Other than State Capital:pH-6.5-9.0; BOD - <30 mg/l; TSS- <100 mg/l & FC- <1000 MPN/100 ml


Status UPJN(R) UPJN(U) Development Authority BLW UDD UPSIDC NOIDA/ G.NOIDA Awas Vikas NAPS Total
Compliant 27 31 5 0 2 0 12 1 1 79
Non-Compliant 4 13 13 0 3 0 0 0 0 33
Non-Operational 2 3 1 1 0 1 0 0 0 8
Total 33 47 19 1 5 1 12 1 1 120